A rollout built on site facts, not assumptions.

Every Knull deployment runs through six stages. Each has a purpose, a named split of responsibilities, and an explicit exit before the next begins.

Principle

Nothing is quoted or scheduled before the site has been assessed. Dock locations, power and connectivity are site facts, and they set the plan.

01The journey

Six stages, each with an exit.

Stages are sequential because each one produces the input the next one needs.

  1. 01

    Discovery

    Weeks

    Establish what the destination is trying to fix, and whether connected shopper mobility is the right instrument for it.

    Exit criteria

    A shared, written statement of the problem and the intended coverage.

    Knull

    • Structured session with operations and commercial stakeholders
    • Review of the problem in the destination's own terms
    • Early view of coverage: whole estate, one arm, one level

    Operator

    • Nominate an operational owner and a commercial owner
    • Share footfall pattern and known pain points
    • Confirm the areas in scope for assessment
  2. 02

    Site assessment

    On site

    Replace assumptions with site facts before anything is designed, quoted or scheduled.

    Exit criteria

    A documented assessment: candidate dock locations, constraints and dependencies.

    Knull

    • Walk the estate: entrances, levels, dwell points, walking distances
    • Assess candidate dock locations for power, connectivity and access
    • Document servicing routes and storage

    Operator

    • Provide access, floor plans and any planned works
    • Identify constraints on dock placement and installation windows
    • Confirm landlord or tenant approvals required
  3. 03

    Deployment design

    Design cycle

    Turn the assessment into a specific fleet, dock network and operating model.

    Exit criteria

    An agreed deployment design and a commercial proposal built from it.

    Knull

    • Fleet size and dock network proposal with placement rationale
    • Operating model: redistribution, service and escalation ownership
    • Measurement criteria proposed for the first phase

    Operator

    • Review and agree dock placement
    • Confirm the operational split and named responsibilities
    • Agree the measurement criteria before launch
  4. 04

    Pilot or initial launch

    Defined period

    Put the service in front of real shoppers in a defined zone, under agreed measurement.

    Exit criteria

    A live service in the pilot zone, with data being recorded against the agreed criteria.

    Knull

    • Install docks and commission the fleet
    • Brief the destination team on the console and exception workflow
    • Monitor closely through the opening period

    Operator

    • Provide power and connectivity at agreed dock locations
    • Support installation access and any wayfinding changes
    • Run the day-to-day exception workflow
  5. 05

    Operate and learn

    Ongoing

    Find out where the deployment design was right and where the destination behaves differently to expectation.

    Exit criteria

    A review against the agreed criteria, with specific adjustments identified.

    Knull

    • Review utilisation, dock pressure and service events with the operator
    • Recommend dock or fleet adjustments based on observed behaviour
    • Resolve issues raised through the console

    Operator

    • Work the exception list as part of normal operations
    • Raise patterns the data does not capture
    • Participate in scheduled reviews
  6. 06

    Scale

    Phased

    Extend coverage on evidence rather than optimism.

    Exit criteria

    Coverage extended, with the operating model updated to match.

    Knull

    • Design the next phase using observed data, not the original estimate
    • Phase installation around trading
    • Update the operating model as coverage grows

    Operator

    • Confirm the next zones and the commercial structure for them
    • Plan installation windows
    • Fold the service into standard operating procedure

02Schedule

What actually determines the timeline.

We give an indicative schedule after assessment rather than a generic number here — because these four factors decide it.

Dock locations

Where docks can physically go, and who has to approve each position.

Power provision

Whether power exists at those positions or has to be brought to them.

Connectivity

Coverage at dock level, which is often different to coverage at concourse level.

Access windows

When installation can happen without disrupting trading.

Next step

Start with an assessment.

A short discovery session and a site walk are enough to tell you whether connected shopper mobility is the right instrument for your destination.